Video: Installing metal construction of Sports hall - covered Velodrume, Plovdiv

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.

Video: Sports hall - covered Velodrume, Plovdiv

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.

A little Consideration, a little Thought for Others, makes all the difference.

Winnie the Pooh

You can't stay in your corner of the Forest waiting for others to come to you. You have to go to them sometimes.

 

Winnie the Pooh

The secret of success is to know something nobody else knows.

Aristotle Onassis

If you would create something, you must be something.

Johann Wolfgang von Goethe

If you have built castles in the air, your work need not be lost; that is where they should be. Now put foundations under them.

Henry David Thoreau

Experience is the child of thought, and thought is the child of action.

Benjamin Disraeli

Sport hall - covered Velodrome

Plovdiv

Sports Complex "Velodrum", Plovdiv - awarded with prize: Building of the Year 2015
Investor: Plovdiv Municipality.
General contractor to 2-nd stage from Completion of construction in the rough of Sports Complex: Metalstroy AMS Ltd.

The multifunctional sports hall has a built area of 9845 m2 and built-up area 27 015 m2. It has a combined sports court for volleyball, handball, basketball and ten more kinds of sports, and 1 m above it, in the shape of an asymmetrical oval, there is an Olympic-size cycling track.

This unique sports facility is designed under the guidance of the world-renowned Dutch architect Sanders Dauma, who has designed the Olympic cycling tracks in Athens and Manchester.

The metal structure of the building is designed by Astron Buildings S.A. - Luxembourg, and is manufactured in their facilities in Czech Republic and Hungary. The installation was performed by "Metalstroy AMS" Ltd.  

After a three-year hiatus, when the construction of the building was resumed, Metalstroy AMS was selected as a General contractor of stage II – completion of construction in the rough of Sports Complex.


Обратно